Process & permits

The Custom Cabinet Process and Permits in Palm Beach County

From first estimate to final walkthrough, here is how a custom cabinet project works, plus what to confirm about permits and condo or HOA approvals in Palm Beach County.


Most people who start a custom cabinet project have the same two questions. What will the process look like, and will I need anyone’s permission to do it? Both are fair, and both have clearer answers when you know what to expect.

This guide covers the steps of a typical custom cabinet project and what to check about permits and approvals in Palm Beach County. A caution up front: requirements are set by each city, by the county, and by individual associations, and they change. We are not a substitute for your building department. We can help you understand what is likely to apply and what to ask.

The custom cabinet process, step by step

Every project has its own wrinkles, but most follow the same overall path. Here is how we present it.

Step 1: Free estimate and consultation

We start by listening. What do you want the space to do, what is bothering you about it now, and what style do you like? We will ask about your budget range, your timing, and any building rules you have to follow. You do not need finished plans. Photos, sketches, and inspiration images are plenty to begin with.

After that, you receive a written estimate. We reply within 1 business day, and the estimate is free. If something is unclear, ask. Our guide to what drives the cost of custom cabinets can help you read any proposal.

Step 2: Measure and design

Accurate measurements are the foundation of a good fit. Walls, ceilings, windows, outlets, plumbing locations, and appliance sizes all need to be recorded. This is also when we note anything unusual, such as uneven walls or a soffit that has to be worked around.

From there, we prepare precise layouts so you can see how the cabinetry will sit in the room. Materials, finishes, and door styles are chosen together at this point. The aim is to resolve questions on paper, where changes are easy, instead of in the middle of installation.

Step 3: Approvals and ordering

Once the design is final, you approve it in writing. If your project needs a permit or an association approval, this is the stage to sort that out, before the build begins. Hardware, countertop details, and appliance specs are confirmed so that nothing is left to guess.

Step 4: Build

Our craftsmen build your custom cabinetry using quality materials chosen during design. Because the cabinets are made to your measurements and not pulled from a standard catalog, this stage takes time. We will explain the expected schedule for your project in your estimate rather than promising one here.

Step 5: Delivery and installation

Installation is where preparation pays off. Cabinets are set level and secured, doors and drawers are adjusted, and filler pieces and trim are fitted. If a countertop is part of your plan, the cabinets are usually in place first so the countertop can be templated to them.

Step 6: Final walkthrough

At the end, we walk the finished work with you. You test the doors and drawers, review the finish, and point out anything that needs a touch-up. We want you to feel comfortable with the result, not rushed through it.

Do cabinets need a permit?

The honest answer is that it depends. Replacing cabinets in the same location, with no changes to plumbing, electrical, or walls, often does not require a permit. But that is a general pattern, not a rule, and your city or the county may see it differently.

Permits are more likely to come into play when the work goes beyond the cabinets themselves. These are examples of changes that typically involve a permit and licensed trades:

  • Moving or adding a sink, dishwasher, or other plumbing fixture.
  • Adding or relocating outlets, switches, lighting circuits, or appliance wiring.
  • Relocating a range hood or changing how it vents.
  • Removing, moving, or opening a wall, especially a load-bearing one.
  • Changing gas lines for a cooktop or range.

In Palm Beach County, requirements can differ between municipalities such as Delray Beach, Boynton Beach, West Palm Beach, and unincorporated areas. The best source is always the building department for your address. They can tell you what is required and how to apply.

Condos, HOAs, and associations

If you live in a condominium or a community with a homeowners association, the association may have its own approval process, separate from any city permit. Even a project that needs no permit at all can still need the board’s sign-off.

Requirements vary by building, but associations often ask for some or all of the following:

  • A written renovation or alteration request, sometimes with plans or a scope of work.
  • A certificate of insurance from the contractor, often naming the association as an additional party.
  • Proof of a contractor license or registration, where applicable.
  • Scheduled use of the service elevator and loading areas, sometimes with a deposit.
  • Work-hour rules, including quiet hours, weekends, and holidays.
  • Floor protection in common areas and rules for debris removal.
  • Approval for changes that affect noise between units, such as flooring beneath cabinets.

Boards can take time to review requests, so it helps to submit early. Your property manager is usually the right first contact. If you are in a high-rise or a building with strict elevator scheduling, ask about move-in and delivery windows before you set a date with us.

What to verify, and who to ask

  1. Call or check the website of the building department for your city or county, and ask whether your planned work needs a permit.
  2. Read your association’s rules, or ask the property manager for the renovation guidelines and forms.
  3. Ask what documents the association requires from contractors, including insurance certificates.
  4. Ask about work hours, elevator reservations, and delivery rules.
  5. Share all of the above with us so your schedule and estimate reflect the real constraints.

Please treat the points above as a starting checklist, not as legal or regulatory advice. Rules change, and only your building department and association can tell you what applies to your property.

How we help

We can help you understand what applies to your project, point out which parts are likely to trigger a permit or an association review, and coordinate our schedule around the rules you give us. If your project involves plumbing or electrical, we will be clear about which parts need licensed trades and who is responsible for each.

If you are planning a full renovation, our kitchen cabinets page is a good place to start. For storage and work spaces, take a look at custom closets and home office cabinetry, where the same process applies.

Ready to talk about your project?

No cost, no obligation. We reply within 1 business day.

or call (561) 922-6800

Texting consent is optional and not required to request an estimate.

CallGet a Free Estimate